Construction of Eltexsanoat Industrial & Warehouse Facility (20 × 50 × 7 m) — TAN GROUP

 

About the Project and Execution Speed

Heavy-duty industrial facility construction requires an optimal balance between structural integrity and swift execution. In 2021, TAN GROUP completed a major industrial project for Eltexsanoat — a 20 × 50 m facility featuring 7-meter clear-height ceilings (1000 m2 footprint).

The hallmark of this development was its accelerated schedule: full-spectrum structural assembly and envelope enclosure were successfully achieved in just 30 days.

Executed Construction and Installation Services

1. Structural Steel Framing & Assembly

The initial engineering phase focused on assembling the primary steel chassis. Utilizing high-strength steel structures, our team executed advanced steel-frame building construction. The 7-meter ceiling clearance combined with a 20-meter clear span ensured an unobstructed floor plan tailored for industrial equipment and warehouse racking systems.

2. Sandwich Panel Installation & Envelope Enclosure

To achieve high thermal performance and complete weatherproofing, specialized sandwich panel building techniques were applied. Our crews executed professional sandwich panel installation in Tashkent across the entire wall and roof envelope. Thermal insulated panels guarantee optimal climate control and lower operating utility costs.

Project Outcome

Delivering the Eltexsanoat facility in 1 month demonstrates TAN GROUP’s engineering capacity to build high-performance prefabricated warehouses in Tashkent and industrial facilities across Uzbekistan under strict timelines.