A power plant control center was designed and built for GRIDCON in Olmazor district using LSTK and sandwich panels in 7 days.
A laboratory building for VIROX in Navoi region was constructed using LSTK and sandwich panels. A fast and high-quality solution.
A temporary office for KOC Construction in Bukhara was built in 15 days using LSTK and sandwich panels.
Construction of a control center for GRIDCON Energy power plant completed. LSTK and sandwich panels were used, finished in 6 days.
Temporary office building for PBG constructed in 15 days, full cycle from foundation to interior finishing. 2026.
Turnkey construction of a 400-person modular Workers Camp (6 blocks) for Aurum Group using LSTK technology.
A modern sales office for Bizning Uylar Development constructed on a turnkey basis by TAN GROUP using LSTK framing and sandwich panel technology.
Delivered full general contracting and complete construction management for the Toshkent Plaza project.
Completed structural, electrical installation, and interior finishing works turnkey.
Construction of the new DISCOVER INVEST office: structural framing, electricals, and finishing in 6 months.
Ministry of Finance renovation: facade, interior finishes, HVAC, and electricals in 9 months.
Completed structural framing, electrical installation, interior, and exterior finishes in 5 months.
Structural steel framing and sandwich panel assembly for a 20×50×7m facility in just 1 month.
Completed full-scale interior finishing and architectural fit-out works in Chinobod Plaza resort within 4 months.
Complete construction of the 8-story Chimgan Plaza: concrete, facade, and finishing in 12 months.
Completed structural framing, facade, interior/exterior finishes, HVAC, and electrical works in 6 months.
Completed concrete, steel frame, roofing, facade, and interior finishing works.
A kindergarten construction project, built from scratch using LSTK and sandwich panels, was completed in 2020.
Built modern production workshops and warehouses from LSTK for "IFODA Agro Kimyo Himoya" in Namangan.
Construction of the ATLAS furniture center from scratch: from excavation to finishing in just 3 months for Discover Invest.
Design and construction of an LSTK and sandwich panel boiler house in 15 days.
In 2017, TAN GROUP constructed an indoor football pitch, performing all works from foundation preparation to LSTK roofing.
Modern bakery constructed using LSTK and sandwich panels. The project ensures durability and energy efficiency.
Turnkey construction of the 54×96×6m IMZO factory in Nukus using LSTK framing and energy-efficient sandwich panels.
Construction of a 4-block warehouse in So'x district using LSTK and sandwich panels. Project completed in 1 month.
Design and construction of the Soxovat poultry complex in 2016. 13 buildings erected and handed over in 4 months.