- :
In 2017, TAN GROUP completed a project to construct a boiler house building using light steel thin-walled structures (LSTK) and sandwich panels.
The scope of work included the engineering design of the prefabricated boiler house, rapid assembly of a strong and lightweight steel frame, and the installation of energy-efficient sandwich panels.
The entire design and construction process was successfully completed within 15 days.
Leave a request
Write to us and we will definitely contact you
