Iconinfo@tangroup.uz
  • :

The construction project for the GRIDCON Energy power plant control center has been successfully completed. This facility is critical for the efficient operation of the energy complex.

Work began with the development of a detailed project plan for the control center, considering all requirements.

Next, a strong and durable frame was installed using Light Steel Thin-Walled Structures (LSTK). Modern sandwich panels were also installed, providing thermal and sound insulation.

The core construction was completed in 6 days. The premises were prepared for the installation of control systems and equipment.

Leave a request

Write to us and we will definitely contact you