Iconinfo@tangroup.uz
  • :

In 2017, TAN GROUP completed the construction of an indoor football pitch. The team carried out a full cycle of works, starting from preparing a solid foundation to installing the building's roof structure.

During the project, a strong foundation was laid, and the ground was leveled. To ensure comfortable playing conditions, a high-quality top coating was installed. The roof frame was assembled using light steel thin-walled structures (LSTK), and the building was insulated with durable sandwich panels.

Leave a request

Write to us and we will definitely contact you